Medium-term optimization of pumped hydro storage with stochastic intrastage subproblems
| Type of publication: | Inproceedings |
| Citation: | |
| Booktitle: | Power Systems Computation Conference (PSCC), Wrocław, Poland |
| Year: | 2014 |
| Abstract: | This paper presents a medium-term self-scheduling of pumped hydro storage plants. A decomposition of the problem into inter- and intrastage subproblems, where the intrastage problems themselves are formulated as multi-stage stochastic programs, allows the detailed consideration of short-term flex- ibility. The method is presented together with three alterna- tive approaches, where the short-term flexibility is considered differently: (1) with aggregated peak and off-peak prices, (2) with price duration curves and (3) with deterministic intrastage subproblems. The approaches are compared and evaluated in a Monte Carlo operation simulation study. The study is performed on a realistic hydro power plant with consideration of revenue from ancillary services. |
| Keywords: | energy, Energy Markets, hydro power, modeling, stochastic optimization |
| Authors | |
| Added by: | [] |
| Total mark: | 0 |
|
Attachments
|
|
|
Notes
|
|
|
|
|
|
Topics
|
|
|
|
